Dubai Road Upgrade to Cut Travel Time from 20 Minutes to Just 5

Dubai Road Upgrade to Cut Travel Time from 20 Minutes to Just 5

Dubai’s Roads and Transport Authority (RTA) has awarded a major infrastructure contract to upgrade the intersection of Sheikh Zayed bin Hamdan Al Nahyan Street, Al Awir Road, and Al Manama Street, a move set to dramatically improve traffic flow across a critical transport corridor.

Once completed, the project is expected to reduce travel time from 20 minutes to just 5 minutes, delivering a significant boost to daily commuting efficiency for residents, businesses, and logistics operators.

Traffic Capacity to Increase by 176%

According to RTA, the upgrade will increase traffic capacity by 176%, easing obstruction in one of Dubai’s rapidly developing areas. The project is designed to accommodate increasing traffic volumes, which are a consequence of regional expansion, new residential areas, and growing commercial activity

Authorities say the improvement will be instrumental in facilitating more efficient linkage between principal regions and adjacent road systems.

2.3km of Bridges and Expanded Road Lanes

These enhancements will allow uninterrupted traffic flow, reduce bottlenecks during peak hours, and improve road safety.

  • enhancements: improvements, upgrades, advancements, developments, augmentations
    uninterrupted traffic movement: continuous traffic flow, steady vehicle circulation, smooth movement of vehicles, unhindered traffic.
  • reducing bottlenecks: alleviating congestion, easing traffic jams, minimizing snarl-ups, cutting down on choke points
  • Improving road safety: enhancing highway security, increasing safety on the roads, and making roads safer.

The upgraded intersection will also feature improved entry and exit points, ensuring seamless access to neighbouring residential zones and future development areas.

Supporting Dubai’s Urban Growth

The project aligns with Dubai’s broader urban planning and mobility strategy, which focuses on future-ready infrastructure, reduced commute times, and improved quality of life. By strengthening connections between key corridors, the upgrade is expected to support real estate growth, commercial activity, and overall economic development in the area.

Urban planners note that such projects are essential as Dubai continues to expand outward while maintaining efficient transport links.

Completion Target Set for Q3 2028

Construction is scheduled in phases, with project completion expected in the third quarter of 2028. RTA has assured motorists that traffic management plans will be in place during construction to minimize disruption.

Once operational, the upgraded intersection is expected to become a vital traffic hub, significantly improving daily travel experiences across the emirate.

A Step Forward for Smarter Mobility

This upgrade in Dubai signifies a major leap in urban mobility, boosting efficiency, flow, and convenience on key routes through quicker journeys, handling more vehicles, and better access for everyone, aligning with Dubai’s goal for top-tier, inclusive transport infrastructure.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.